top of page

Plumbers at work - Bathroom refresh in SE19

Plumber: Gordon

Job Duration: 4 days

Brief:

Install a new basin, bath with panel and toilet. Fit new luxury vinyl floor and light.


Gordons notes:

"Removed old bath, panel riser rail and taps and corner shelf and curtain rail. Removed toilet and boxing. Removed basin. Removed old sticky tiled floor. Installed new bath and panel and taps with overflow waste and trap. Installed shower panels around bath area to ceiling. Installed old curtain rail and corner shelf. Boxed around toilet but kept everything accessible. Used new toilet flexible pan connector. Installed basin pedestal with new taps and waste and trap. Installed new luxury vinyl wood effect flooring. Removed old light and installed new light.







Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page